Etudes d'impact

Documents

Order by : Name | Date | Hits | [ Descendent ]

	Environmental and social impact assessment of the BUI Hydropower Project - Final report Environmental and social impact assessment of the BUI Hydropower Project - Final report

Date added: 10/20/2009
Date modified: 11/21/2012
Filesize: 11.88 MB
Downloads: 3007
ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT OF THE BUI HYDROPOWER PROJECT - FINAL REPORT
 
The Government of Ghana has proposed the construction and operation of a hydroelectric power development (the ‘Bui Project’) on the Black Volta River at the Bui Gorge in north-western Ghana. This is the final report of the Environmental and Social Impact Assessment Study of the Bui Hydroelectric Power Project. This main report is accompanied by a separate volume containing a large number of annexes; inter alia, these provide copies of individual technical reports on specific aspects of the environment and socio-economy of the Bui area that have been prepared to support the analysis in the ESIA.

Synthèse des évaluations environnementales et orientations quant à la réalisation du projet Synthèse des évaluations environnementales et orientations quant à la réalisation du projet

Date added: 02/09/2010
Date modified: 11/21/2012
Filesize: 1.82 MB
Downloads: 4126
SYNTHÈSE DES ÉVALUATIONS ENVIRONNEMENTALES ET ORIENTATIONS QUANT À LA RÉALISATION DU PROJET
OMVS

Ce rapport à pour objectifs de :

  • Faire la synthèse et le bilan de l'évaluation environnementale de tous les composants du projet Energie Manantali,
  • Préciser la position, les engagements et les moyens qui seront mis en oeuvre par OMVS pour ce qui concerne :
  • le plan d'atténuation des impacts;
  • le plan de surveillance durant la construction;
  • le suivi environnemental de l'exploitation;
  • Faire le point sur les moyens qui seront déployés afin d'assurer une gestion optimale des réservoirs.

Programme d'atténuation et de suivi d'impact sur l'environnement Programme d'atténuation et de suivi d'impact sur l'environnement

Date added: 02/09/2010
Date modified: 11/21/2012
Filesize: 3.74 MB
Downloads: 4537
PROGRAMME D'ATTÉNUATION ET DE SUIVI D'IMPACT SUR L'ENVIRONNEMENT (PASIE)
OMVS - 1977

Ce programme est constitué de 5 parties :
PARTIE A - Programme d'atténuation des impacts et de surveillance de la construction
PARTIE B - Programme d'appropriation des empires
PARTIE C - Programme d'optimisation de la gestion des réservoirs
PARTIE D - Programme de suivi et de protection de l'environnement durant l'exploitation
PARTIE E - Programme de santé environnementale

Etude environnementale du barrage de Lom Pangar - Rapport de synthèse Etude environnementale du barrage de Lom Pangar - Rapport de synthèse

Date added: 10/21/2009
Date modified: 11/21/2012
Filesize: 11.44 MB
Downloads: 7611

ETUDE ENVIRONNEMENTALE DU BARRAGE DE LOM PANGAR - RAPPORT DE SYNTHESE

Le présent document constitue le rapport de synthèse de l’étude d’impact sur l’environnement du projet de barrage de Lom Pangar.
Il a pour vocation de synthétiser et de mettre en cohérence les éléments saillants issus, d’une part d’une vingtaine d’études thématiques  et d’autre part, des différentes phases de consultation du public qui se sont déroulées pendant la réalisation des études environnementales ainsi qu’au moment de la restitution des travaux menés par les consultants.

Étude d’impact environnemental et social détaillée : Rapport de synthèse générale Étude d’impact environnemental et social détaillée : Rapport de synthèse générale

Date added: 08/21/2009
Date modified: 11/21/2012
Filesize: 4.44 MB
Downloads: 9942

PROGAMME KANDADJI DE REGENERATION DES ECOSYSTEMES ET DE MISE EN VALEUR DE LA VALLEE DU NIGER
ETUDE D'IMPACT ENVIRONNEMENTAL ET SOCIAL DETAILLEE

Le Gouvernement de la République du Niger, représenté par le Haut Commissariat à l’Aménagement de la Vallée du Niger (HCAVN) a confié cette étude d’impact environnemental et social détaillée à Tecsult International Ltée assisté par le bureau d’études Bétas, sur financement du Fonds Africain de Développement. Le contrat no 001/2004/HCAVN a été signé par les deux parties le 29 novembre 2004 et le début des travaux a été fixé en janvier 2005.

Télécharger la version anglaise du rapport de synthèse ( 4Mo)