Documents divers

Documents

Order by : Name | Date | Hits | [ Descendent ]

Interaction of Chinese institutions with host governments in dam construction, The Bui dam in Ghana Interaction of Chinese institutions with host governments in dam construction, The Bui dam in Ghana

Date added: 03/04/2013
Date modified: 03/04/2013
Filesize: 571.84 kB
Downloads: 3291

The present study of the Bui Dam, Ghana, thus investigates the role Chinese construction companies play in hydropower investment. It focuses on the collaboration between Sinohydro and China Exim Bank and Ghana’s government departments and regulatory bodies during planning and implementation in order to identify the processes over which the Ghanaian government retains control, the areas of responsibility delegated to the company and the mechanisms for ensuring the its compliance with national legislation and international standards.

Acquisitions foncières en Afrique : que disent les contrats Acquisitions foncières en Afrique : que disent les contrats

Date added: 03/04/2013
Date modified: 03/04/2013
Filesize: 460.29 kB
Downloads: 3442

Acquisitions foncières en Afrique : que disent les contrats ? est la traduction française de Land deals in Africa: What is in the contracts?, première édition française par l’Institut International pour l’Environnement et le Développement (Royaume-Uni) en mars 2011.

	Article du mensuel camerounais Extractive Industrie (mars 2010) au sujet du barrage de Lom Pangar Article du mensuel camerounais Extractive Industrie (mars 2010) au sujet du barrage de Lom Pangar

Date added: 11/18/2012
Date modified: 11/18/2012
Filesize: 385.02 kB
Downloads: 3447

ARTICLE DU MENSUEL CAMEROUNAIS EXTRACTIVE INDUSTRIE (MARS 2010) AU SUJET DU BARRAGE DE LOM PANGAR : « Les élites de l’Est réclament une place au soleil »

UNEP Dams and Development Project, Compendium on Relevant Practices - 2nd Stage : Revised Final Report, Benefit Sharing Issue UNEP Dams and Development Project, Compendium on Relevant Practices - 2nd Stage : Revised Final Report, Benefit Sharing Issue

Date added: 03/04/2013
Date modified: 03/04/2013
Filesize: 359.35 kB
Downloads: 3565
This report presents the results of a study on the identification, collection of information and compilation of examples of relevant practices concerning the integration into policy/normative frameworks and implementation of the benefit sharing key priority issue.

Voyage d'étude des acteurs du projet de barrage de Fomi (Kouroussa) sur le site du barrage de Garafiri (Kindia) Voyage d'étude des acteurs du projet de barrage de Fomi (Kouroussa) sur le site du barrage de Garafiri (Kindia)

Date added: 03/05/2013
Date modified: 03/05/2013
Filesize: 842.84 kB
Downloads: 3608

Dans le cadre du partage des expériences entre les populations autour des réservoirs de barrages en Afrique de l’Ouest et suite aux recommandations de l’atelier de restitution de la visite d’échange d’expériences entre les populations des barrages de Fomi (Guinée) et de Sélingué (Mali) tenu à Kankan en mars 2011, un voyage d’étude des acteurs du futur barrage de Fomi dans la région de Kankan sur le site du barrage de Garafiri (Kindia) dans la région de Kindia, a été organisé du 26 au 28 juin 2012.